Home About us Tongzhou introduction Industry cluster Key project Investment guide
Columns
Investment Cost Reference
Contacu Us
Tel:(8610)69513551
Fax:(8610)69518391
Email:info@bjtzzs.gov.cn
Home>en>Investment guide>Investment Cost Reference>
Article Table
Taxation 点击:0
 Deed Tax: Rate of deed tax is 3% Land Appreciation Tax: The calculation formula is: Appreciation amount*Tax rate–Sum of deductible items*Deduction of quick calculation Four-grade progressive rates are adopted as follows. For that part of the apprec(2007-01-26)
Real Estate and Rental Price 点击:0
 At present, estate investment in Tongzhou is a best choice. The average price is about 4,000 RMB/m2. With establishment of new town planning in Beijing, the infrastructure and environmental facilities in new Tongzhou will be further developed. There(2007-01-26)
Capital Construction Fee 点击:0
 1.Service fee for awarding and contracting of construction project is 1.1‰ (total cost of project is base of charging). 2.Fee for base bid price determination: 1-3‰ (collected by agency companies with total cost of project as base of charging). 3.(2007-01-26)
Workshop Use Fee 点击:0
 Build workshop: Standard workshop in frame structure is 650-850 RMB/m2/year. Rent workshop: rental for standard workshop in industrial zone is 150-360 RMB/m2/year, for standard workshop outside industrial zone is 60-150 RMB/m2/year.(2007-01-26)
Land Use Fee 点击:0
 Land transfer price: 1.Land price varies according to different projects. Generally the transfer price of industrial land with infrastructure reaching "eight put through and one leveling off" is 250,000-350,000 RMB/mu (about 46.87-65.62 USD/m2). 2.R(2007-01-26)
Insurance 点击:0
 In accordance with relevant provisions of Beijing Municipal Social Insurance Fund Management Center, the maximum and minimum amount of social insurance is shown in the table below. Insurance Base Amount Proportion Endowment Insurance The base amount(2007-01-26)
Directive Salary Rates for Labor Market 点击:0
 Directive Salary Rates for Labor Market (RMB/month) No. Profession Average Salary 1 Executive 2,000-3,000 2 General Management 1,500-2,000 3 Engineering Technician 1,000-1,500 4 Mechanic 800-1,000 5 Employee 600-800 Income Tax Rates for Foreigners W(2007-01-26)
Property management fee 点击:0
 Water price (including waste water treatment fee) Category Water charge (Unit price: RMB yuan/m 3 ) Waste water treatment fee (Unit price: RMB yuan/m 3 ) Residential use 3.70 1.20 Non-business and administrative use 5.40 1.80 Industrial and commerci(2007-01-26)
Copyright 2007 www.bjtzzs.gov.cn All Rights Reserved
China. All rights reserved Tongzhou Beijing Investment Promotion Bureau